Tiller
TOPSOIL
Average depth – 39 cm
Working capacity – 1680 m2/h
SAND
Average depth – 41 cm
Working capacity – 3732 m2/h
GRAVEL
Average depth – 40cm
Working capacity – 3 254 m2/h
Flail
TOPSOIL
Average depth – 29,28 cm
Working capacity – 1282 m2/h
SAND
Average depth – 28.43 cm
Working capacity – 1428 m2/h
GRAVEL
Average depth – 22.82 cm
Working capacity – 1223 m2/h